Various

"Scientific American Supplement, No. 799, April 25, 1891"

ft.
The ampere hour treatment required for Salford was found to be about
0.37 ampere hours per gallon, and the I.H.P. per million gallons based
on these figures would be 37.
NOTE.--In estimating for the plant necessary for treating the whole of
the Salford sewage, a margin was allowed on above figures. The A.H.T.
was taken at 0.4 and the I.H.P. per million at 39 to 39.5.
Mr. Octavius March, electrical engineer, who has followed the process
from the commencement, and who superintended the electrical details both
at Crossness and Salford, will give you on the blackboard a rough sketch
of the above trial plant.
The Salford tanks are admirably adapted to the application of the
electrical or in fact any process of precipitation. They are 12 in
number, and it is proposed to take two end tanks for the electrical
channels, in which the iron electrodes would be placed.
The total I.H.P. required for treating the whole of the Salford and
Pendleton sewage, taken at 10,000,000 gallons per 24 hours, is
calculated at 400 I.H.P., based on the actual work done during the
trial. The electrical plant would consist of four engines and dynamos,
any three of which could do the whole work, and three boilers, each of
200 I.